Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Progress of JT-60SA Project; EU-JA joint efforts for assembly and fabrication of superconducting tokamak facilities and its research planning

Shirai, Hiroshi; Barabaschi, P.*; Kamada, Yutaka; JT-60SA Team

Fusion Engineering and Design, 109-111(Part B), p.1701 - 1708, 2016/11

 Times Cited Count:22 Percentile:88.83(Nuclear Science & Technology)

The JT-60SA Project has shown steady progress toward the first plasma in 2019. JT-60SA is a superconducting tokamak designed to operate in the break-even conditions for a long pulse duration with a maximum plasma current of 5.5 MA. Design and fabrication of JT-60SA components shared by EU and Japan started in 2007. Assembly in the torus hall started in January 2013, and welding work of the vacuum vessel sectors is currently on going on the cryostat base. Other components such as TF coils, PF coils, power supplies, cryogenic system, cryostat vessel, thermal shields and so forth were or are being delivered to Naka site for installation, assembly and commissioning. This paper gives technical progress on fabrication, installation and assembly of tokamak components and ancillary systems, as well as progress of JT-60SA Research Plan being developed jointly by EU and Japanese fusion communities.

Oral presentation

Present status of nuclear fusion R&Ds in the JT-60SA project

Higashijima, Satoru; JT-60SA Team

no journal, , 

no abstracts in English

Oral presentation

Progress in the satellite tokamak programme

Koide, Yoshihiko

no journal, , 

Manufacture of components for the satellite tokamak JT-60SA has progressed under the cooperation of Japan and Europe, and on-site work by Europe will be soon carried out. Assembly work is also progressing on track for the start of the experiment in March 2019.

3 (Records 1-3 displayed on this page)
  • 1